• EU HRC (N. Europe)€750–795/tex-works N. Europe; German mill offers €775–795/t; seller deals €750–760/t for December and offers €770–785/t ex-works; trade source said prices below €785/t no longer seen at mills; Fastmarkets index €775.63/t on 18 Nov18 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$89.10/dmtseaborne 61% fines, SMM; unchanged d/d20 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

Jindal lifts its former Ilva plan to €7.5 billion with a possible second Taranto EAF, reports say: what it changes for ADI coil buyers

Jindal Steel International has added a possible second EAF, DRI and pellet plant at Taranto and €7.5 billion of group investment to its bid, Italian papers report. Loharo compares it with Arvedi’s and sets out the winter stops ADI buyers should plan for.

By Mara AlvestadPublished 6 min read
Illustration: hot briquetted iron stockpiled under a shelter on an overcast summer day
Illustration of a hot briquetted iron stockpile under shelter

Jindal Steel International has widened its bid for the former Ilva. In a letter dated 19 November to the commissioners running Acciaierie d’Italia (ADI) and Ilva, the Indian group extended its binding offer to 7 May 2027 and attached an addendum that lifts total planned investment to €7.5 billion, including a possible second electric arc furnace (EAF) at Taranto backed by a direct reduced iron (DRI) plant and a pelletising plant, Quotidiano Nazionale reported after seeing the document (QN). Quotidiano di Puglia reported the same €7.5 billion and 4,500 jobs by 2036, and said the figure is not for Taranto alone (Quotidiano di Puglia). Neither Jindal nor the commissioners have published the revised plan. For EU flat-steel buyers this changes nothing for early-2027 supply: no buyer has been chosen and Taranto still makes no steel of its own. If you buy ADI coil, plan around the winter stops at its northern finishing plants, set out below.

What is new since our 10 November report

When we compared the two binding bids on 10 November, Jindal’s plan, as reported, was one EAF, slab mostly imported from Oman and about 3,000 workers, with no investment figure (Two binding bids for the former Ilva). Il Secolo XIX put that original offer at €1.5 billion, a 2 million-tonne EAF, 4 million tonnes a year of Omani slab and 3,500–4,000 jobs, with DRI only if the market recovered (Il Secolo XIX). According to QN, the addendum now:

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo
  • adds a possible second EAF at Taranto, supported by a DRI plant and a pelletising plant;
  • raises planned investment to €7.5 billion across an integrated system that also covers further DR/HBI and lower-emission slab production in Oman;
  • keeps slab supply from Jindal’s existing plants in the short term;
  • puts the workforce at up to 4,500 by 2036, against 5,200 in Arvedi’s plan.

The commissioners had asked both bidders to clarify and add to their 8 November offers. Il Secolo XIX reported on 24 November that they need “a couple of weeks” more before advisers and the ministry take over. QN reported that the government views Arvedi’s plan favourably and that a Jindal award could face a golden-power review. We reported on 13 November that Taranto’s hot end is off and its strip mill rolls bought-in slab (Taranto’s hot end is now fully off).

Loharo calculation: the two offers side by side

MeasureJindal Steel InternationalArvediWorking
Purchase price, as reported€200m in 10 equal yearly instalments€350m in one payment (of which €340m relates to debts owed to the state)QN
Paid in year one€20m€350m€200m ÷ 10; Arvedi single payment
Planned investment, as reported€7.5bn, including Oman€3bn, of which €2.793bn for the Taranto EAF and power plantQN; scopes differ
Taranto steelmaking, as reportedOriginal: one 2 Mt EAF; addendum: a possible second EAF with DRI and pellets (size not reported)300 t EAF from 2030 (3.0 Mt/y), then a second EAF with DRI, up to 6 Mt/yQN; Il Secolo XIX
Imported slab in the original model4 Mt of 6 Mt = about 67%None once the EAFs run4 ÷ (4 + 2)
Jobs by 2036 as a share of ADI’s 9,626 staff4,500 = about 47%5,200 = about 54%Il Secolo XIX headcount
Loharo calculation from press reports of unpublished offers: QN (25 November), Il Secolo XIX (24 November). Not like-for-like: Jindal’s €7.5bn covers plants outside Italy.

Analysis. On these reports, Jindal has moved closer to Arvedi on steelmaking in Taranto, but its plan still starts with imported slab, and its second furnace is described as possible, not committed. For coil rolled from non-EU slab, CBAM on that slab is a cost someone pays; we set out how to estimate it in our 10 November report.

What this means for buyers

Nothing changes for Q1 2027: no buyer has been chosen and Taranto rolls bought-in slab. Il Secolo XIX reported that ADI’s Genoa coating, pickling and tinplate lines run to the end of November, then take a long Christmas stop with staff recalled from 11 January 2027, while Novi Ligure restarts around mid-February when new coil arrives (Il Secolo XIX).

If you buy ADI coated or tinplate, confirm December–February delivery dates now and line up back-up volume. In any 2027 contract, ask how it passes to a new owner and, if Jindal wins, which country the slab was melted and poured in.

Stay ahead of the steel market

We’ll email you a confirmation link. Unsubscribe anytime. See our Privacy Policy.

What to watch

  • The commissioners’ assessment of both revised offers, expected in about two weeks from 24 November, and any choice sent to the government.
  • Any statement from Jindal Steel International or the commissioners confirming the addendum’s figures, and the size of the possible second EAF.
  • A golden-power review if Jindal is chosen, and Jindal’s EU merger and foreign-subsidies filings.

Verification status: Developing

  • As of 26 November 2026. The revised Jindal figures come from QN, which saw the 19 November letter and addendum, and are corroborated by Quotidiano di Puglia; the original offer and the review timetable come from Il Secolo XIX. Neither bidder nor the commissioners have published the offers. The comparison is a Loharo calculation with the inputs shown. Recheck due 10 December 2026.
  • Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.

Sources

Main report

Supporting sources

Last fact-check: 26 November 2026.

Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.

Ask the Analyst

“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.