• EU HRC (N. Europe)€750–795/tex-works N. Europe; German mill offers €775–795/t; seller deals €750–760/t for December and offers €770–785/t ex-works; trade source said prices below €785/t no longer seen at mills; Fastmarkets index €775.63/t on 18 Nov18 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$89.10/dmtseaborne 61% fines, SMM; unchanged d/d20 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

Algoma’s second EAF makes first steel after Q3 shipments fall 65%

Algoma’s Q3 2026 shipments fell 65.5% after its blast-furnace exit, a power outage and US tariffs; its second EAF made its first heat on 9 October. Loharo sets out the limited read-across for EU buyers.

By Alex MorganPublished Updated 4 min read
Illustration: electric arc furnace control room overlooking the melt shop
Illustration of an electric-arc furnace control room

Analysis. Algoma sells mainly in North America, so the impact on EU buyers is limited and no step is needed yet. The read-across is about decarbonisation: a blast-furnace mill that has switched fully to electric-arc furnaces shows how slowly a converted plant gets back to volume. Its second EAF made its first heat on 9 October; buyers should not treat that as booked supply.

Executive summary

  • Algoma shipped 144,527 net tons of steel in Q3 2026, down 65.5% from 419,173 tons a year earlier, after ending blast-furnace production in January.
  • The company also cites US Section 232 tariffs on its export sales and a power outage that stopped steelmaking from 17 to 29 August.
  • Its second EAF produced its first heat on 9 October; Algoma expects it to add to shipments in Q4. Next watch: Q4 results, typically published in February.

Key numbers

144,527 tons Q3 2026 shipments, against 181,473 in Q2 and 419,173 a year earlier FactAlgoma 6-K; SteelOrbis

≈131,100 t Q3 shipments in metric tonnes Calc.Loharo, from Algoma’s release

9 October first heat of liquid steel at EAF Unit Two FactAlgoma 6-K; call transcript

Fact = checked against the cited source · Calc. = Loharo calculation from cited figures · Analysis = interpretation.

What happened

Algoma’s 28 October results release, filed with the SEC, reported Q3 shipments of 144,527 net tons, against 419,173 a year earlier. It gives three reasons: the move to EAF-only steelmaking after blast-furnace operations were permanently halted on 18 January 2026, the effect of US Section 232 tariffs on export sales, and an outage at its Lake Superior Power plant. SteelOrbis independently reports the same shipments and the 181,473 tons shipped in Q2.

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo

According to the earnings call, a turbine fault on 17 August paused EAF production, interim arrangements allowed a restart on 29 August, and full generating capability returned on 30 September. Plate made up about 105,000 tons, roughly 73% of shipments. Net sales realisation rose to C$1,510 a ton. After the quarter closed, EAF Unit Two produced its first heat on 9 October, which was rolled into hot-rolled coil; the company expects it to contribute to Q4 production and shipments.

On 3 November, shipbuilder Seaspan named Algoma and the Canadian steel processor Stigterstaal as primary plate suppliers for up to six Canadian Coast Guard multi-purpose icebreakers: up to 24,000 metric tonnes of structural steel, about 4,000 tonnes a ship, in a deal valued at about C$182 million, according to Seaspan’s release, which Algoma republished. Algoma’s chief executive called it the largest polar-class steel order in the mill’s history. No delivery schedule was given.

Loharo calculation · how deep was the trough?

Calculation. From Algoma’s figures (net tons of 2,000 lb): year on year = (144,527 − 419,173) ÷ 419,173 = −65.5%; quarter on quarter = (144,527 − 181,473) ÷ 181,473 = −20.4%. In metric tonnes, 144,527 × 0.9072 ≈ 131,100 t. The year-ago quarter was blast-furnace output, so this is not a like-for-like run-rate. For scale, the icebreaker order of up to 24,000 t equals about 18% of Q3 shipments (24,000 ÷ 131,100 ≈ 0.18), but it is spread over a multi-ship programme with no published delivery dates, so it says nothing about any one quarter.

What it means for buyers

Analysis. A first heat is a commissioning milestone, not evidence that commercial output has reached a particular volume. For EU buyers following low-CO₂ steel, the lesson is to ask any EAF-converted supplier for a dated ramp-up commitment rather than a nameplate figure. If you buy Canadian plate, ask which EAF unit supplies the order and for a written shipment date; with domestic shipbuilding orders now taking Algoma plate, check that an export allocation is confirmed in writing.

Who is affected

EU buyers considering Canadian plateConfirm timing Ask which EAF unit makes the order and for a written shipment date; do not infer export availability from the first heat.

What to watch next

  • Algoma’s Q4 2026 results, typically published in February; no date had been announced as of 10 November 2026. Watch for the first quantified Unit Two output.
  • Any change to US Section 232 tariffs on Canadian steel, which Algoma cites as a reason for lower export sales.

Verification status: Verified

Shipments, causes and operating dates were checked against Algoma’s SEC-filed release and cross-checked with SteelOrbis and the call transcript; the icebreaker order against Seaspan’s release, republished by Algoma. The metric conversion and buyer implications are Loharo analysis.

Ask the Analyst

“1,000 t HRC from Japan into Houston”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Sources

Primary sources

Algoma Steel Group Inc. reports financial results for the three months ended September 30, 2026 (Exhibit 99.1) — Algoma Steel, SEC Form 6-K, 28 October 2026.

Seaspan places record-breaking Canadian steel order with Algoma, Stigterstaal to build Canada’s next generation of icebreakers — Seaspan Shipyards, 3 November 2026 (republished by Algoma Steel, 4 November 2026).

Supporting sources

Algoma Steel posts Q3 loss as shipments appear to bottom out — SteelOrbis, 31 October 2026.

Algoma Steel Group Q3 2026 earnings call transcript — Stock Analysis, 28 October 2026.

Last fact-check: 10 November 2026. Market intelligence, not investment advice.