Tata Steel Nederland earned about €55 of EBITDA per tonne delivered in July to September, up from about €3 a tonne in the previous quarter, after IJmuiden’s Direct Sheet Plant restarted in early August. In its second-quarter results on 7 November, Tata Steel said Dutch EBITDA rose to €72 million from €4 million, while its UK business lost £56 million as deliveries fell to 0.38 million tonnes. For EU buyers of hot-rolled and downstream flat steel, IJmuiden’s Direct Sheet Plant, shut for most of April to June according to Mint, is back at rated capacity, the company says. If you are pricing first-quarter 2027 coil, include a Tata Steel Nederland quote alongside other mills, and keep a second source while the Dutch plant runs under its regulatory framework. For UK supply the buyer impact is limited for now.
What Tata Steel reported
In the Netherlands, revenue was €1,395 million and EBITDA €72 million in the quarter, according to the company’s results release. Liquid steel output was 1.52 million tonnes and deliveries 1.30 million tonnes, against 1.40 million tonnes delivered in the previous quarter (volumes update). The chief financial officer, Koushik Chatterjee, said the improvement came from favourable pricing and the restart of the Direct Sheet Plant. The company says the plant is now operating at rated capacity “under the agreed framework with local regulatory authorities”, and that it is working with regulators to stay compliant. In rupee terms, Dutch EBITDA was still below the year-earlier quarter (₹790 crore against ₹916 crore), Business Standard reported.
Reach steel buyers and importers worldwide
Put your brand in front of the people who buy and trade steel.
Advertise with LoharoIn the UK, revenue was £411 million and the EBITDA loss £56 million. Deliveries fell 22% from the previous quarter. Tata Steel blamed weak demand and stock built up in the UK supply chain ahead of the new safeguard measures that took effect on 1 July 2026, and said imports remain elevated. The UK business now serves customers by processing bought-in substrate while its electric arc furnace is built; the company said construction is ramping up. On the earnings call, chief executive T V Narendran said he expects the UK business to approach breakeven in the January to March quarter as excess stock clears, Mint reported.
Loharo calculation: earnings per tonne delivered
| Per tonne delivered | Apr–Jun 2026 | Jul–Sep 2026 |
|---|---|---|
| Netherlands EBITDA | €4m ÷ 1.40 Mt ≈ €3/t | €72m ÷ 1.30 Mt ≈ €55/t |
| Netherlands revenue | €1,445m ÷ 1.40 Mt ≈ €1,032/t | €1,395m ÷ 1.30 Mt ≈ €1,073/t |
| UK EBITDA | −£27m ÷ 0.48 Mt ≈ −£56/t | −£56m ÷ 0.38 Mt ≈ −£147/t |
| UK revenue | £484m ÷ 0.48 Mt ≈ £1,008/t | £411m ÷ 0.38 Mt ≈ £1,082/t |
Analysis Dutch revenue per tonne rose about 4% while EBITDA per tonne went from almost nothing to about €55, which fits the company’s own explanation: better prices, plus the improved product mix and cost profile it credits to the restart; the figures do not show how much each factor contributed. In the UK, revenue per tonne also rose, but the loss per tonne more than doubled because the fixed costs were spread over fewer tonnes. One report of the results gave €2,840 million as the Dutch revenue for the September quarter and a £57 million UK loss; in Tata Steel’s release, €2,840 million is the half-year figure and the quarterly UK loss is £56 million.
What it means for buyers
Analysis Supply from IJmuiden looks steadier than in the spring, but management’s own words tie it to a framework agreed with regulators, so a single-source contract on Dutch hot-rolled coil still carries plant risk. Tata Steel also expects higher realisations in the December quarter, Mint reported, which is in line with EU mills seeking higher prices for 2027 contracts. In first-quarter 2027 talks, compare a Tata Steel Nederland offer with at least one other mill, and check what your contract says about delivery shortfalls if the plant stops again. The UK result is mainly a UK market story; EU buyers need no step yet.
Stay ahead of the steel market
What to watch
- October to December quarter: whether Dutch EBITDA per tonne holds near the July to September level now that the Direct Sheet Plant runs all quarter.
- March 2027: the extended deadline for Tata Steel Nederland’s green steel agreement with the Dutch state.
- UK stock: whether excess UK inventory clears enough for the UK business to approach breakeven by March, as Tata Steel expects.
Verification status: Verified
- The results, volumes and plant status come from Tata Steel’s own 7 November results release and 7 October volumes update, read by the writer; Business Standard’s rupee figures match them. Outlook comments from the earnings call are attributed to Mint’s report. The per-tonne table and the reconciliation are Loharo work, with the inputs and their limits stated.
- Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.
Primary sources
- Tata Steel reports Consolidated EBITDA of Rs 10,665 crores for the quarter and Rs 20,035 crores for the half year ended September 30, 2026 — Tata Steel, 7 November 2026
- Tata Steel: 2QFY2027 Production and Delivery Volumes (Provisional) — Tata Steel, 7 October 2026
Supporting sources
- Tata Steel Q2 net profit up 18.2 per cent Y-o-Y, led by India operations — Business Standard, 7 November 2026
- Tata Steel beats Q2 profit estimates on strong demand, cost savings — Mint, 7 November 2026
Related on Loharo
- EU mills seek €100–150/t more for 2027 coil contracts; buyers expect €50–80/t
- Tata Steel Nederland and Dutch state push green steel deal deadline to March 2027
- Tata Steel’s Port Talbot EAF grid link faces an estimated 34-week piling delay, Senedd told
Last fact-check: 9 November 2026.
Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.