• EU HRC (N. Europe)€750–795/tex-works N. Europe; German mill offers €775–795/t; seller deals €750–760/t for December and offers €770–785/t ex-works; trade source said prices below €785/t no longer seen at mills; Fastmarkets index €775.63/t on 18 Nov18 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$89.10/dmtseaborne 61% fines, SMM; unchanged d/d20 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

CSN sold 141,000 t through German sections mill SWT in Q3 as it negotiates a €550m sale to Megasa: what EU beam buyers should check

CSN sold 141,000 tonnes through Stahlwerk Thüringen in the third quarter while it negotiates the mill’s €550 million sale to Spain’s Megasa. Loharo’s calculation from CSN’s figures and the contract checks for EU buyers of sections.

By Mara AlvestadPublished 4 min read
Illustration: steel beams being unloaded from a truck at a construction site on a rainy night
Illustration of structural steel beams being delivered to a building site

Brazil’s CSN sold 141,000 tonnes of steel through its German sections mill Stahlwerk Thüringen (SWT) in the third quarter, it said on 12 November (CSN Q3 2026 results), while it negotiates the sale of SWT to Spain’s Megasa group for an enterprise value of €550 million. For EU buyers of beams and sections nothing changes yet: the deal has only reached a binding term sheet. If you have SWT contracts running into 2027, check now what their change-of-control or assignment clause says, and ask SWT to confirm that agreed prices and delivery dates stand if the mill changes hands.

What happened

CSN signed the binding term sheet with Bipadosa, the holding company of the Megasa group, on 9 October (CSN material fact). It gives up to 10 weeks of exclusivity and an enterprise value of €550 million, subject to adjustments; definitive agreements and the usual conditions precedent are still to come. CSN describes SWT, in Unterwellenborn, as a long-steel producer specialising in structural sections with 1.1 million tonnes a year of installed steel capacity. Megasa is a Spanish long-products group with plants in Spain, Portugal and France, CSN said.

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo

In its third-quarter release CSN said its sales outside Brazil were 305,000 tonnes, down 14.7% on the second quarter because of the northern summer holidays but up 10.0% on a year earlier, which it put down to recovering steel consumption in Europe. SWT accounted for 141,000 tonnes; Lusosider, Gramperfil and Galvacolor for 75,000 tonnes; CSN’s LLC unit for 51,000 tonnes; and direct exports for 38,000 tonnes. The group reported a net loss of R$1,247.3 million, reflecting a weaker mining result and other operating expenses, with net debt of R$44.9 billion, 4.23 times last-twelve-months EBITDA, and named the SWT term sheet as evidence of progress on asset sales.

Loharo calculation: SWT in CSN’s own figures

MeasureFigureWorking and source
SWT installed capacity1.1 Mt a year, about 275,000 t a quarterCSN material fact, 9 October; 1,100,000 ÷ 4
SWT sales, Q3 2026141,000 tCSN Q3 release
Q3 sales against a quarter of capacityAbout 51%Loharo: 141,000 ÷ 275,000; sales, not production, in a quarter CSN calls seasonally weak
SWT share of CSN’s sales outside BrazilAbout 46%Loharo: 141,000 ÷ 305,000
Enterprise value per tonne of capacityAbout €500 a tonneLoharo: €550m ÷ 1.1 Mt; before adjustments
End of exclusivityBy about 18 December 2026Loharo: 9 October + 10 weeks (the maximum)
Loharo calculation from CSN’s 9 October material fact and third-quarter release (read 16 November 2026).

Analysis SWT is the largest single contributor to CSN’s sales outside Brazil, and the sale would move a 1.1 Mt sections mill to a group that already makes long products in Spain, Portugal and France. The 51% figure is a sales ratio for one seasonally weak quarter, not a utilisation rate, and CSN gives no SWT production figure. The release does not say whether Megasa plans changes at the mill, and the price per tonne says nothing about future section prices.

What this means for buyers

Analysis Beam and section deliveries from Unterwellenborn are not affected by the term sheet itself, and CSN’s release reports no operational change at the mill. The practical risk is contractual: a change of owner could bring new commercial terms, so read the assignment and change-of-control clauses in any SWT contract that runs past mid-December and ask for written confirmation of agreed volumes. Recheck after the exclusivity period ends.

What to watch

  • Definitive agreements: whether CSN and Megasa sign before the exclusivity period ends, around 18 December.
  • Merger clearance: any competition filing, given Megasa’s existing long-products business.
  • Megasa’s plans for SWT: product range, sales organisation and any changes to price lists after closing.

Verification status: Verified

  • Deal terms, SWT capacity and Megasa’s footprint come from CSN’s 9 October material fact; sales volumes and financial figures come from CSN’s third-quarter release. The table and buyer steps are Loharo analysis from those figures.
  • Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.

Sources

Primary sources

Last fact-check: 16 November 2026.

Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.

Ask the Analyst

“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.