• EU HRC (N. Europe)€750–795/tex-works N. Europe; German mill offers €775–795/t; seller deals €750–760/t for December and offers €770–785/t ex-works; trade source said prices below €785/t no longer seen at mills; Fastmarkets index €775.63/t on 18 Nov18 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$89.10/dmtseaborne 61% fines, SMM; unchanged d/d20 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

voestalpine’s steel revenue falls 15% as Danube and rail delays slow deliveries; it trims its forecast

voestalpine’s Steel Division revenue fell 15% quarter on quarter in July–September as low Danube water and rail limits held back deliveries, and the group cut the top of its EBITDA forecast. Loharo’s calculation of what the forecast implies, and what it means for buyers of Linz flat steel and plate.

By Mara AlvestadPublished Updated 6 min read
Illustration: a barge loaded with steel coils on a wide river in autumn drizzle
Illustration of steel coils moving by river barge in wet autumn weather

Revenue at voestalpine’s Steel Division fell 15% from the first to the second quarter of its business year, to €1,300 million in July to September, as seasonal factors and logistics problems cut shipments: low water on the Danube and limits on rail traffic have held back deliveries of finished steel, particularly since August, the Austrian group said in its half-year report on 11 November. It also cut the top of its full-year EBITDA forecast and said higher logistics costs increase the need for price adjustments, while it sees positive price signals for October to March. For EU buyers of Austrian flat steel and heavy plate, that points to price-increase requests and slower deliveries rather than spare supply. Before you confirm first-quarter 2027 orders from Linz, check delivery dates and whether your contract lets the mill pass on freight or logistics surcharges.

What voestalpine reported

For the group, revenue in the six months to 30 September was €7,655.5 million, 0.8% more than a year earlier, and EBITDA rose 17.1% to €845.9 million, the company said in its results release. That EBITDA includes net positive one-off effects of about €100 million, mainly from the sale of its BÖHLER Profil subsidiary, booked in the first quarter; the company said there were no one-offs in the second quarter.

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo

The Steel Division, based in Linz, which makes flat steel and heavy plate, made EBITDA of €406.2 million in the half year, 2.5% more than a year earlier, on revenue 1.6% lower. The report says higher prices could not fully offset slightly lower shipments and a weaker product mix, because pipeline and offshore projects that use high-grade heavy plate were delayed by uncertainty in the Middle East. It describes automotive demand as generally satisfactory despite lower European car production, and construction, white goods and mechanical engineering as subdued.

On logistics, voestalpine said in its results Q&A that raw-material deliveries were not materially affected, as most arrive by rail, but that bottlenecks on the Danube and on rail have hit deliveries of finished products from the Steel Division and raised logistics costs. The group now expects full-year EBITDA of €1.60 billion to €1.70 billion, down from €1.60 billion to €1.85 billion, citing energy and logistics costs linked to the war in the Middle East, delayed energy projects and provisional extra US duties on its tubular business. Austrian daily Krone also reported the lowered forecast.

Loharo calculation: what the cut forecast implies

MeasureFigures (€ million)Working
Steel Division revenue, Jul–Sep 2026 vs Jul–Sep 20251,300.4 vs 1,383.0−82.6, or −6.0%
Steel Division EBITDA, Jul–Sep 2026 vs Jul–Sep 2025187.8 vs 206.4−18.6, or −9.0%
Group EBITDA needed in Oct 2026–Mar 2027 (new range)1,600–1,700 minus 845.9about 754 to 854
Same, under the old range1,600–1,850 minus 845.9about 754 to 1,004
Group EBITDA at the Jul–Sep pace (no one-offs)350.9 × 2about 702
Second half needed vs Jul–Sep pace754 ÷ 702 and 854 ÷ 702about 7% to 22% higher
Loharo calculation from voestalpine’s half-year report and results release (11 November 2026). The forecast and the second-half figures are for the whole group, not the Steel Division alone; the business year runs from April to March.

Analysis Even the lower forecast needs the group to earn more in October to March than at its July to September pace, by roughly 7% at the bottom of the range. That is in line with the price signals voestalpine describes, but it is the company’s forecast, not a certainty, and the table does not show how much would come from steel prices rather than rail, aerospace or cost cuts. In the Steel Division, profit fell faster than revenue year on year in the second quarter, which fits higher logistics costs, although the report gives no split.

What this means for buyers

Analysis If you buy flat steel or heavy plate from Linz, expect voestalpine to push for higher prices in the coming months, partly to recover logistics costs, and allow extra time for deliveries while the Danube and rail problems last. Check whether your contract fixes the delivery terms and who carries freight or logistics surcharges before you agree first-quarter volumes. Delayed pipeline and offshore projects may leave some high-grade plate capacity less busy, but voestalpine gives no figures, so do not count on shorter plate lead times. Other EU flat-steel mills are also asking for more in the first quarter (Loharo’s HRC report).

Stay ahead of the steel market

We’ll email you a confirmation link. Unsubscribe anytime. See our Privacy Policy.

What to watch

  • Danube water levels and rail capacity: whether delivery delays from Linz ease before first-quarter 2027 shipments.
  • The Linz power-grid connection: due this autumn, the next milestone before the electric arc furnaces in Linz and Donawitz start up in the first half of 2027 (Loharo’s Donawitz report).
  • Third-quarter results: whether the Steel Division’s prices and earnings recover from the July to September level, as the forecast assumes.

Verification status: Verified

  • All figures, causes and the outlook come from voestalpine’s own half-year report, results release and results Q&A of 11 November, read in full by the writer; the forecast cut is also reported by Krone. The table and the buyer reading are Loharo work, with inputs and limits stated.
  • Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.

Sources

Primary sources

Supporting sources

Related on Loharo

Last fact-check: 11 November 2026.

Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.

Ask the Analyst

“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.