• EU HRC (N. Europe)€750–785/tex-works N. Europe; seller tradeable €770–780/t for January volumes; buyer indications €750–765/t and €780–785/t ex-works; Fastmarkets index €770.83/t on 12 Nov12 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$90.35/dmtseaborne 61% fines, SMM; +$0.15/dmt d/d13 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

European HRC mills seek higher Q1 prices, but slow spot trade leaves buyers room to check cover

A 6 November EUROMETAL report, citing Fastmarkets assessments from 4 November, showed differing Northern European and Italian HRC levels, with mills negotiating Q1 business while spot activity remained slow. Buyers should separate firm, comparable offers from targets and confirm delivery timing before adding cover.

By Alex MorganPublished Updated 4 min read
Illustration: hot steel strip passing through a coil box in a rolling mill
Illustration of hot-strip coil equipment in a rolling mill

European mills were seeking higher prices for first-quarter 2027 hot-rolled coil, while spot activity remained slow, according to EUROMETAL’s 6 November report relaying Fastmarkets market information. For buyers, the first step is to map uncovered Q1 tonnes by month and ask suppliers for offers on the same specification, delivery basis and validity period. A mill target is not a concluded deal, and a late-quarter delivery should not be compared directly with an earlier slot.

The report described a market with limited availability for the remainder of 2026 and mills focused on Q1 annual contracts. In Northern Europe, sources cited by Fastmarkets said mills were pursuing higher levels, supported by order books and limited imports, but buyers were reluctant to accept them amid muted demand. In Italy, producers were also focused on Q1 contracts, with limited spot activity. These are reported market assessments, not official price statistics.

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo

Loharo working: the North–Italy index gap on 4 November

EUROMETAL reported Fastmarkets’ 4 November daily ex-works indices at €764/t for Northern Europe and €745.50/t for Italy.

Loharo check: 4 November ex-works indices€/t
Northern Europe764.00
Italy745.50
North–Italy difference18.50

Calculation: €764.00 − €745.50 = €18.50/t.

This is a same-date comparison of two reported domestic HRC index assessments, not a buyer’s delivered-cost difference or a forecast. It indicates that a single “European HRC price” can hide a regional gap. It does not establish that the same coil, delivery date or contract terms were available in both locations.

The same report relayed a buyer indication of €780/t delivered in Northern Europe, equivalent to €760–765/t ex-works after deducting reported delivery costs. It also reported offers of €800–830/t delivered for January–March production, equivalent to €780–815/t ex-works; the upper-end offers were excluded from the index calculation because they related to later production months while earlier material was available. The distinction is useful: a headline offer for a later slot is not automatically comparable with a current tradeable level.

What to do before Q1 restocking

1. Separate firm cover from exposure. List committed tonnes and uncovered tonnes by month, grade and delivery location. If demand is still uncertain, ask suppliers to quote defined volume bands or staged delivery options rather than treating the whole quarter as one purchase.

2. Compare like with like. Request the price basis, delivery location, production month, validity, payment terms and any extras in writing. Convert delivered and ex-works offers only where the quoted delivery costs are clear. The reported €18.50/t regional index gap is a prompt to compare locations, not a shortcut for valuing a specific order.

3. Ask what is actually available. EUROMETAL’s report says one Northern buyer needed two to three weeks to assess additional Q1 requirements. That illustrates why buyers should ask mills when the slot must be confirmed and when the offer expires. Do not equate an announced target with a confirmed order or production allocation.

4. Keep imports as a verified alternative. The Loharo Tracker’s displayed official report is dated 30 October and warns that its balances could not be refreshed recently. It showed Türkiye’s category 1A HRC line used up, with India and Viet Nam still showing small balances. Since those figures may be stale, refresh the official line before using an import offer in a Q1 comparison. Check product code, origin and expected clearance timing with the supplier and broker.

The decision is not simply whether prices will rise. It is whether the cost of waiting for clearer demand is lower than the risk of losing a suitable delivery slot, and whether an alternative offer is genuinely comparable once location, timing and trade-measure status are checked. A practical approach is to secure the tonnes needed for confirmed orders, ask for refreshed quotes on the balance, and set a dated review point before the supplier’s offer expires.

What would change this view: Faster order intake, a material change in mill delivery availability, or refreshed official quota data showing a viable import route could alter the balance between domestic cover and waiting.

Verification: Verified. The 4 November index assessments, reported offers and buyer comments are presented as Fastmarkets market information relayed by EUROMETAL. The €18.50/t difference is Loharo’s arithmetic using those dated figures; it is not an independent price benchmark.

Ask the Analyst

“2,000 t HRC from India into Genoa in Q1 2027 at €610/t CFR”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Sources

Last fact-check: 8 November 2026.

Related on Loharo

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.