A buyer framework for comparing EAF and BF-BOF HRC offers without treating origin defaults as mill-specific verified emissions.
EU buyers often group steel by origin or grade, but production route can matter for emissions accounting. Electric arc furnace (EAF) and blast-furnace/basic oxygen furnace (BF-BOF) routes have different process profiles; a buyer still needs supplier-specific, verified installation data before treating one quote as a lower-CBAM offer. This analysis separates what can be compared now from what remains [CHECK] for a real supplier and product.
Reach steel buyers and importers worldwide
Put your brand in front of the people who buy and trade steel.
Advertise with LoharoExecutive summary
- Use the free calculator’s EU default scenario as a screening baseline, not as a claim about an individual mill’s route.
- Ask both EAF and BF-BOF suppliers for comparable verified emissions evidence covering the same product, installation and period.
- Compare the adjusted CBAM cost with the commercial quote and other landed-cost inputs; keep unsupported process-route numbers marked [CHECK].
What route tells a buyer
An EAF melts metallic feed, commonly scrap and/or direct reduced iron, using electricity; a BF-BOF route reduces iron ore in a blast furnace and converts hot metal in a basic oxygen furnace. Those broad descriptions are useful procurement questions, but they do not establish the emissions intensity of a particular coil. Scrap share, metallic inputs, electricity mix, process configuration, allocation methodology, product boundary and installation-level verification all matter. Any route-to-number shortcut would risk turning a technology label into a false emissions claim.
CBAM reporting and certificate exposure rely on the applicable emissions method and regulatory data, not a generic label on a mill brochure. For a screening exercise, Loharo’s calculator uses EU default values for a selected product, origin and year. It does not let the buyer substitute supplier-specific verified data in the free workflow. The difference between “default for origin/product” and “verified actual for installation/product” must remain explicit in the spreadsheet and the negotiation.
Loharo calculation: use the same reference basket
| Calculator scenario | Input | Displayed estimate | What it is not |
|---|---|---|---|
| India HRC | CN 7208; 1,000 t; 2026 | €277.58/t; €277,583 total | Not an India mill’s verified BF-BOF result |
| Türkiye HRC | CN 7208; 1,000 t; 2026 | €109.90/t; €109,897 total | Not an EAF supplier result |
| Viet Nam HRC | CN 7208; 1,000 t; 2026 | €102.82/t; €102,818 total | Not a verified production-route comparison |
Loharo calculation. Inputs: product HRC CN 7208, origin as listed, 1,000 tonnes, import year 2026. Values are copied from the live calculator, whose calculation includes its displayed default emissions, markup, free-allocation adjustment and whole-certificate rounding. The three numbers show the calculator’s country/product outputs; they cannot support the inference that one origin is EAF and another BF-BOF. Supplier-route emissions for named mills are [CHECK] and are not available in this comparison.
A fair supplier comparison
- Ask for the installation identity and route, but treat the route as context rather than a substitute for the required emissions record.
- Confirm the emissions boundary, production period, product mapping, allocation method and verification status are aligned across both offers.
- Compare the quoted price and commercial terms on the same delivery basis, then add CBAM only using the relevant official default or accepted verified-data method.
- Run a sensitivity case if the supplier cannot deliver the evidence before the buyer’s contracting or customs deadline; state the unresolved input as [CHECK].
Implications by role
For an importer, the default-based calculator can establish an initial reference but not the final supplier comparison. An EU mill may want to show product-level emissions evidence alongside quality and delivery reliability, while avoiding a broad route claim that is not supported for the specific line. A non-EU supplier should confirm early whether verified installation data is available and whether the buyer can use it for the relevant period. A trader should preserve the underlying documents and specify which emissions scenario the offer assumes.
What could change this view: comparable verified supplier data for both offers, with the same HRC scope, time period and boundary. Until then, any asserted EAF-versus-BF CBAM price advantage is [CHECK]. Buyer action: include the evidence request in the RFQ, not after the purchase order.
Ask the Analyst
“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the AnalystSources
- Loharo free CBAM calculator — checked 23 Nov 2026; data version shows 15 Oct 2026 fetch/check.
- European Commission CBAM legislation and guidance — official defaults and guidance.
- Implementing Regulation (EU) 2025/2621 — default values, as corrected by Implementing Regulation (EU) 2026/1740.
- Implementing Regulation (EU) 2025/2620 — benchmarks.
Verification status: Partially verified
Calculator outputs are transcribed from the live tool; process-route labels do not identify the route or verified emissions of a particular supplier. Supplier-specific route and emissions figures remain [CHECK].
Last fact-check: 23 November 2026. This is an indicative buyer framework, not legal advice or an official CBAM declaration.