• EU HRC (N. Europe)€750–795/tex-works N. Europe; German mill offers €775–795/t; seller deals €750–760/t for December and offers €770–785/t ex-works; trade source said prices below €785/t no longer seen at mills; Fastmarkets index €775.63/t on 18 Nov18 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$89.10/dmtseaborne 61% fines, SMM; unchanged d/d20 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

EAF and BF-BOF HRC suppliers: what CBAM changes, and what it does not

EU default CBAM estimates for HRC are not EAF or BF-BOF mill results. Use a like-for-like calculator basket, then request verified supplier data.

By Tavishi BalanPublished 4 min read
Illustration: Hot strip rolling stands with orange steel, low long view
Illustration

A buyer framework for comparing EAF and BF-BOF HRC offers without treating origin defaults as mill-specific verified emissions.

EU buyers often group steel by origin or grade, but production route can matter for emissions accounting. Electric arc furnace (EAF) and blast-furnace/basic oxygen furnace (BF-BOF) routes have different process profiles; a buyer still needs supplier-specific, verified installation data before treating one quote as a lower-CBAM offer. This analysis separates what can be compared now from what remains [CHECK] for a real supplier and product.

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo

Executive summary

  • Use the free calculator’s EU default scenario as a screening baseline, not as a claim about an individual mill’s route.
  • Ask both EAF and BF-BOF suppliers for comparable verified emissions evidence covering the same product, installation and period.
  • Compare the adjusted CBAM cost with the commercial quote and other landed-cost inputs; keep unsupported process-route numbers marked [CHECK].

What route tells a buyer

An EAF melts metallic feed, commonly scrap and/or direct reduced iron, using electricity; a BF-BOF route reduces iron ore in a blast furnace and converts hot metal in a basic oxygen furnace. Those broad descriptions are useful procurement questions, but they do not establish the emissions intensity of a particular coil. Scrap share, metallic inputs, electricity mix, process configuration, allocation methodology, product boundary and installation-level verification all matter. Any route-to-number shortcut would risk turning a technology label into a false emissions claim.

CBAM reporting and certificate exposure rely on the applicable emissions method and regulatory data, not a generic label on a mill brochure. For a screening exercise, Loharo’s calculator uses EU default values for a selected product, origin and year. It does not let the buyer substitute supplier-specific verified data in the free workflow. The difference between “default for origin/product” and “verified actual for installation/product” must remain explicit in the spreadsheet and the negotiation.

Loharo calculation: use the same reference basket

Calculator scenarioInputDisplayed estimateWhat it is not
India HRCCN 7208; 1,000 t; 2026€277.58/t; €277,583 totalNot an India mill’s verified BF-BOF result
Türkiye HRCCN 7208; 1,000 t; 2026€109.90/t; €109,897 totalNot an EAF supplier result
Viet Nam HRCCN 7208; 1,000 t; 2026€102.82/t; €102,818 totalNot a verified production-route comparison
Calculator checked 23 Nov 2026; source data version fetched/checked 15 Oct 2026; Q3 2026 certificate-price reference €82.32/tCO₂e, published 5 Oct.

Loharo calculation. Inputs: product HRC CN 7208, origin as listed, 1,000 tonnes, import year 2026. Values are copied from the live calculator, whose calculation includes its displayed default emissions, markup, free-allocation adjustment and whole-certificate rounding. The three numbers show the calculator’s country/product outputs; they cannot support the inference that one origin is EAF and another BF-BOF. Supplier-route emissions for named mills are [CHECK] and are not available in this comparison.

A fair supplier comparison

  • Ask for the installation identity and route, but treat the route as context rather than a substitute for the required emissions record.
  • Confirm the emissions boundary, production period, product mapping, allocation method and verification status are aligned across both offers.
  • Compare the quoted price and commercial terms on the same delivery basis, then add CBAM only using the relevant official default or accepted verified-data method.
  • Run a sensitivity case if the supplier cannot deliver the evidence before the buyer’s contracting or customs deadline; state the unresolved input as [CHECK].

Implications by role

For an importer, the default-based calculator can establish an initial reference but not the final supplier comparison. An EU mill may want to show product-level emissions evidence alongside quality and delivery reliability, while avoiding a broad route claim that is not supported for the specific line. A non-EU supplier should confirm early whether verified installation data is available and whether the buyer can use it for the relevant period. A trader should preserve the underlying documents and specify which emissions scenario the offer assumes.

What could change this view: comparable verified supplier data for both offers, with the same HRC scope, time period and boundary. Until then, any asserted EAF-versus-BF CBAM price advantage is [CHECK]. Buyer action: include the evidence request in the RFQ, not after the purchase order.

Ask the Analyst

“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Sources

Verification status: Partially verified

Calculator outputs are transcribed from the live tool; process-route labels do not identify the route or verified emissions of a particular supplier. Supplier-specific route and emissions figures remain [CHECK].

Last fact-check: 23 November 2026. This is an indicative buyer framework, not legal advice or an official CBAM declaration.

What could CBAM add to your imports? Try the free calculator, check the Steel Trade Measures Tracker, or request a supplier-specific CBAM Cost Check from €490.

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.