• EU HRC (N. Europe)€750–785/tex-works N. Europe; seller tradeable €770–780/t for January volumes; buyer indications €750–765/t and €780–785/t ex-works; Fastmarkets index €770.83/t on 12 Nov12 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$90.35/dmtseaborne 61% fines, SMM; +$0.15/dmt d/d13 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

Northern European plate rises to €860–885 a tonne as German mills sell out 2026, but Indian and Indonesian plate still lands higher

Fastmarkets put Northern European plate at €860–885 a tonne ex-works on 12 November, with German mills reported fully booked for 2026 and offers at €870–890 for the first quarter. Imports look about €140 cheaper, but Loharo’s landed-cost check shows Indian and Indonesian plate costing more once quotas and CBAM default values are counted, and what verified emissions would need to be.

By Alex MorganPublished 7 min read
Illustration: steel plates resting on the roller table of a plate mill cooling bed in diffuse daylight, seen from an elevated angle
Illustration of steel plates cooling on a plate mill cooling bed

Domestic steel plate in Northern Europe rose to €860–885 a tonne ex-works on 12 November in Fastmarkets’ weekly assessment, up from €840–880 a week earlier, with mills offering €870–890 for first-quarter 2027 delivery and, market participants say, no free volume left for 2026 (Eurometal/Fastmarkets). For EU buyers of 8–40 mm plate, such as fabricators, pipe and tube makers and stockholders, imports look about €140 a tonne cheaper on paper. Loharo’s check shows that the Indian and Indonesian plate on offer lands well above European mill prices once the quota position and CBAM default values are counted. If your first-quarter plate is not yet covered, ask import suppliers for the planned customs clearance date and verified emissions data before you compare their offers with mill prices.

What has changed

According to Fastmarkets, as published by Eurometal, producers in Germany were reported fully booked for 2026 on 5 November because of strong demand from pipe projects. Buyers are not rushing: one trade source said stockists and cutting centres had already ordered large volumes for November–December rolling, and that a new market price would form in the next one to two weeks. Two traders put workable levels at €840–860, but the lower end was left out of the assessment for lack of mill interest.

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo

In Southern Europe the assessment edged up €5 to €745–760 a tonne ex-works. An Italian re-roller put its plate production cost at €750–770 a tonne and said it needs €780 to keep selling into the first quarter, a level buyers have not yet accepted.

Analysis Loharo reconciliation: other reports point the same way. OPIS’s weekly round-up, carried by Eurometal on 9 November, had Northwest European plate at €860 ex-works and €870 delivered in Germany on 6 November. Tribune de la Sidérurgie reported on 3 November that German integrated mills charge at least €870 delivered for S355 plate, and quoted a Bavarian executive who expects €900 delivered to become the low end in the first quarter, with only a few German mills offering there so far. Read together, about €860–885 ex-works is today’s market and €900 delivered is a mill target, not yet a traded level.

Imports: cheaper on paper, not at the border

Fastmarkets kept its import assessment for Northern European ports at €710–750 a tonne CFR, but traders called offers “not available, or absolutely out of interest”. Into Spain, Indian and Indonesian plate was offered at €720–760 CFR, and sources said demand was limited by the stricter EU import regime, the tariff-quota measure that replaced the safeguard on 1 July 2026, with a 50% duty once a country’s quota is used up (European Commission).

The Commission’s TARIC records (last updated 12 November) show where the Q4 quarto-plate quotas stand. India’s 52,710 t (09.9856) and the 18,830 t for other countries without their own line (09.9609) were both used up on 1 October, the first day of the quarter. South Korea has 3,485 t left of 79,918 t and is flagged critical (09.9854); Indonesia has 14,632 t left of 53,154 t (09.9855) and Japan 12,507 t (09.9857).

Loharo calculation: what a €740 CFR import offer costs at the border

Scenario (per tonne)Offer CFROut-of-quota dutyCBAM, default valuesLandedvs South EU mill €752.50vs North EU mill €872.50
India, cleared in Q4 2026 (quota used up)€740€370€277.58€1,387.58+€635+€515
India, cleared in Q1 2027 inside the new quota€740€0€315.70€1,055.70+€303+€183
Indonesia, cleared in Q4 2026 inside quota€740€0€635.26€1,375.26+€623+€503
Indonesia, cleared in Q1 2027 inside quota€740€0€705.89€1,445.89+€693+€573
Loharo calculation. Offer: midpoint of the €720–760 CFR Spain offers for Indian and Indonesian plate; mill prices: midpoints of Fastmarkets’ 12 November ex-works assessments (Eurometal). Duty: 50% of the CFR price, used as a proxy for the customs value. CBAM: Loharo free CBAM calculator for CN 7208 (EU default values of 4.28 t CO₂e/t for India and 8.23 t for Indonesia, plus a 10% mark-up in 2026 and 20% in 2027; BF/BOF benchmark 1.37 t; CBAM factor 97.5% in 2026 and 95% in 2027; Commission Q3 2026 certificate price €82.32). Port handling, inland freight and finance are excluded, and CFR and ex-works are different delivery bases, so the gaps are indicative.

Analysis Even without the 50% duty, both origins land above European mill prices on default values. Verified supplier emissions are the only lever. With actual verified emissions (no default mark-up), an in-quota offer at €740 CFR matches the Northern European midpoint only if its embedded emissions are below about 2.9 t CO₂e a tonne: (€872.50 − €740) ÷ €82.32 = 1.61 t chargeable, plus the 1.34 t free-allocation deduction (1.37 × 0.975) in 2026 gives 2.95 t, or 2.91 t in 2027 (1.37 × 0.95 = 1.30). Against the Southern European midpoint the same working gives about 1.5 t (0.15 + 1.34). These break-evens use the same BF/BOF benchmark as the calculator.

What it means for your plate buying

  • Analysis November–December cover: no step needed yet if your volumes are already booked; the trade expects a clearer Q1 price within two weeks. Our 9 November report found the same wait-and-see pattern in hot-rolled coil.
  • Analysis Q1 2027 mill offers: compare them against the €860–885 ex-works range; treat €900 delivered as a mill target until deals confirm it.
  • Analysis Import offers: ask for the planned clearance date (it decides both the quota quarter and the CBAM year), the origin’s quota line, and installation-level verified emissions. India’s Q4 plate quota went on the first day of the quarter, so an offer that relies on the Q1 quota may face the same risk; agree in the contract who pays the 50% duty if the quota is used up on arrival.

Stay ahead of the steel market

We’ll email you a confirmation link. Unsubscribe anytime. See our Privacy Policy.

What to watch

  • 19 November: Fastmarkets’ next weekly plate assessment, to see whether €870–890 first-quarter offers turn into deals.
  • Weekly Commission quota report: South Korea’s 3,485 t and Indonesia’s 14,632 t of Q4 plate quota, tracked in Loharo’s Steel Trade Measures Tracker.
  • 1 January 2027: new quarterly quotas open, and the 95% CBAM factor and 20% default mark-up apply to goods cleared from then; the Commission publishes the Q4 2026 certificate price on 4 January (European Commission). For the same arithmetic on coil, see our Indian HRC check.

Verification status: Verified

  • Prices and market comments are Fastmarkets’ assessments and trade-source reports as published by Eurometal, consistent with OPIS and Tribune de la Sidérurgie reports; quota balances come from the Commission’s TARIC records (12 November update). The landed-cost and break-even figures are Loharo calculations with inputs shown.
  • Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.

Sources

Primary sources

Supporting sources

Last fact-check: 13 November 2026.

Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.

Ask the Analyst

“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.