• EU HRC (N. Europe)€750–795/tex-works N. Europe; German mill offers €775–795/t; seller deals €750–760/t for December and offers €770–785/t ex-works; trade source said prices below €785/t no longer seen at mills; Fastmarkets index €775.63/t on 18 Nov18 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$89.10/dmtseaborne 61% fines, SMM; unchanged d/d20 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

Meta buys Stegra’s green-steel certificates: what EU buyers of low-CO₂ steel should check in their contracts

Stegra will sell Meta certificates for the green value of its Boden steel, while the physical non-prime steel is sold as conventional. Loharo’s comparison of what each route lets an EU buyer claim, and the contract lines to add.

By Mara AlvestadPublished 6 min read
Illustration: a long, symmetrical aisle of electrolyser stacks in a hydrogen plant hall in neutral daylight
Illustration of an electrolyser hall producing hydrogen for green steelmaking

Stegra has signed a multi-year agreement to sell Meta environmental attribute certificates (EACs) linked to its green-steel plant under construction in Boden, northern Sweden, the company said on 12 November (Stegra release). Meta buys the low-emission claim; the steel behind it is Stegra’s non-prime output, which is sold as conventional steel to buyers who must commit not to make green claims on it. For EU steel buyers nothing changes in supply yet, because the plant is not producing. The step is a contract one: for any low-CO₂ steel you buy, ask the supplier to state in writing whether the environmental attributes stay with your tonnes or have been sold separately.

What happened

Stegra said the certificates will be verified by an accredited third party and that Meta is buying them to address emissions in its supply chain, including steel used to build data centres, and to help finance early-stage production. Meta described it as a new multi-year agreement supporting near-zero-emission primary steel (Meta, 12 November). Neither company gave the number of certificates, the steel volume or the price; Hydrogen Insight reported that none of these was disclosed (via Mining & Metal News).

Advertise

Reach steel buyers and importers worldwide

Put your brand in front of the people who buy and trade steel.

Advertise with Loharo

Meta is the third large technology company to buy Stegra certificates. Microsoft signed both a physical supply deal and a certificate deal in September 2025 (Stegra, 23 September 2025), and Google agreed in September 2026 to buy certificates for up to 91,000 tonnes of steel in the first year (Stegra, 17 September 2026). Stegra says one certificate represents the green value of one tonne of steel from Boden, and that it applies certificates only to non-prime steel: material that misses the original specification and, in a new mill, makes up a larger share of output (Stegra, EACs for steel).

Loharo comparison: what each route gives an EU buyer

RouteWhat the buyer receivesCan that buyer claim low emissions?Example and sourceWhat to check
Physical steel with its green valueThe steel and its emissions performance togetherYes, for the tonnes deliveredMicrosoft’s supply deal with Stegra for coils for its data-centre suppliers (Stegra)A per-delivery emissions declaration, and a fallback if first deliveries slip
Physical non-prime steel sold without its green valueUsable steel, handled as conventional for reporting, product declarations and resaleNo: the buyer commits not to make green claimsStegra’s non-prime output behind its certificates (Stegra)That the price reflects conventional non-prime steel, and that the no-claim clause is passed on to anyone you resell to
Certificate only (EAC)A verified certificate, no steelYes, the certificate holder onlyMeta (2026), Google (up to 91,000 t in year one), Microsoft (2025) (Stegra)It does not change the emissions of the steel you physically receive
Physical low-CO₂ steel from another producer, for comparisonCoil with a product footprintYes, against the final assessmentArcelorMittal XCarb coil for Corinth Pipeworks: 10,000 t, preliminary estimate below 0.75 t CO₂e a tonne (ArcelorMittal, 13 November)The final life-cycle assessment, which ArcelorMittal says comes only after all material is delivered
Loharo comparison built from Stegra’s, Microsoft’s, Google’s, Meta’s and ArcelorMittal’s published deal terms (read 16 November 2026). No certificate price or Meta volume has been published.

Analysis Certificates add revenue for Stegra’s ramp-up, not steel: Stegra said the Google deal adds cash flow in its early years of operation. They do not increase the tonnes EU buyers can buy. They also mean the same Boden production can yield two products: a green claim sold to a technology company, and steel that must be sold and reported as conventional. A delivery that names Boden as its origin does not by itself carry the low-CO₂ value.

What this means for buyers

Analysis Supply from Boden does not change yet. If you buy low-CO₂ coil from any mill, put two lines in the contract: which emissions figure applies to your delivery (and whether it is preliminary or final), and a statement that its environmental attributes have not been sold separately. If you are offered Stegra non-prime material, treat it as conventional steel in price and in your own declarations. For any physical offtake from Stegra, keep a fallback supplier: on 30 September Stegra said it needs more capital to finish the plant (Stegra 100-day review), and its newsroom shows no financing update since (checked 16 November).

What has changed since our last Stegra report

Our 11 October capacity watch and 5 November route comparison reported Stegra’s 30 September statement that Boden needs more completion funding while its production timeline is unchanged. Nothing in that has been updated publicly. What is new is a third large certificate buyer, which adds revenue for the early years but no new steel for EU buyers.

Stay ahead of the steel market

We’ll email you a confirmation link. Unsubscribe anytime. See our Privacy Policy.

What to watch

  • Stegra’s financing: the company said it would give more information on the extra capital as soon as it is available.
  • Certificate volumes: whether Meta’s volume or any price is published, and how much non-prime steel Boden makes in its first year.
  • Final footprints: ArcelorMittal’s final life-cycle figure for the Corinth Pipeworks coil, a test of how preliminary numbers compare with delivered ones.

Verification status: Verified

  • The deal, how certificates work and the earlier Microsoft and Google deals come from Stegra’s and Meta’s own statements; the undisclosed volume and price is attributed to Hydrogen Insight. The comparison table and buyer steps are Loharo analysis built from those published terms.
  • Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.

Sources

Primary sources

Supporting sources

Last fact-check: 16 November 2026.

Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.

Ask the Analyst

“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.