Since 1 October 2026, every EU import of steel covered by the quota regime must state where the steel was melted and poured, with a TARIC document code from Y376 to Y388, and back it with a document coded C131 to C139 showing that country and the heat number. If either is missing, the declaration is rejected (Implementing Regulation (EU) 2026/1963; Dutch Customs). This affects every EU buyer, importer and customs broker handling steel in Annex I of the EU steel regulation, the products under the EU’s tariff quotas. The step now: check that the mill test certificate for every booked shipment states the country of melt and pour for each heat, and ask suppliers to correct it before loading. The flexible first year ends on 30 September 2027.
What the rule requires
Article 4(1) of Regulation (EU) 2026/1384, which has applied since 1 July 2026, requires “verifiable appropriate evidence, such as a mill test certificate” of the country of melt and pour from 1 October 2026. Implementing Regulation 2026/1963 of 28 August 2026 (Official Journal, 31 August) sets out which evidence counts, from 1 October 2026:
Reach steel buyers and importers worldwide
Put your brand in front of the people who buy and trade steel.
Advertise with Loharo- Mill test certificate first: it must include the country of melt and pour and the heat number (Article 1(1)).
- Gaps can be filled by another document carrying the missing item: (a) invoices, (b) delivery notes, (c) quality certificates and clauses in implemented purchase orders or contracts, (d) long-term supplier declarations, (e) cost accounting and production documents, (f) customs documents from the exporting country, (g) commercial correspondence or (h) production descriptions (Article 1(2)).
- No certificate at all is tolerated only from 1 October 2026 to 30 September 2027, if another listed document shows both the country and the heat number (Articles 1(3) and 3).
- Checks and rejection: other documents trigger documentary checks (Article 2(1)), which may delay access to the relevant tariff rate (recital 9). The country is declared with TARIC document codes, and without appropriate verifiable evidence the import is rejected (Article 2(2) and (3)).
What “melt and pour” means
It is where raw steel or iron is first produced in liquid form in a steel- or iron-making furnace and cast into its first solid state, “including remelting of scrap” (recital 3 of 2026/1963; Article 4(1) of 2026/1384). Analysis That is not always the country of origin: sheet rolled in one country from slab cast in another takes the slab’s country, as our October overview noted for re-rollers.
The codes
Dutch Customs’ list (douane.nl) gives the country codes, including Y376 China, Y377 India, Y378 Indonesia, Y379 Vietnam, Y382 Japan, Y383 South Korea, Y384 Türkiye, Y386 European Union, Y387 other countries and Y388 more than one country (for a product made from steel melted and poured in more than one country); the full list also has Y380 Malaysia, Y381 Algeria and Y385 Iran. The Y-code must match the evidence document.
| C-code | Document | 2026/1963, Article 1 |
|---|---|---|
| C131 | Mill test certificate | (1), primary evidence |
| C132 / C133 | Invoice / delivery note | (a) / (b) |
| C134 | Quality certificate or clauses in orders or contracts | (c) |
| C135 | Long-term supplier declaration | (d) |
| C136 | Cost calculation or production documents | (e) |
| C137 | Customs document of the exporting country | (f) |
| C138 / C139 | Commercial correspondence / production descriptions | (g) / (h) |
Loharo decision table: what your certificate shows and what to do
| What your documents show | Declare | What to do |
|---|---|---|
| Certificate states the country of melt and pour and heat number for every heat | Y-code for that country (Y387 if not named), with C131 | Check heat numbers match the invoice and packing list; keep the certificate on file |
| One product made from steel melted and poured in more than one country | Y388, with C131 | Make sure the certificate shows each country for the heats concerned |
| Certificate lacks the country (for example only the mill’s address) or the heat number | No Y-code from the certificate alone if the country is missing | Ask the supplier now; meanwhile complete it with a listed document, such as a long-term supplier declaration (C135), invoice (C132) or delivery note (C133). Expect documentary checks |
| No certificate, but another listed document shows both country and heat number | Until 30 September 2027: the Y-code with that document’s code (C132 to C139) | Expect checks and a possible delay to the in-quota rate; get a proper certificate for arrivals from October 2027 |
| No document shows the country | Nothing you can support | Do not guess a code: the import is rejected without verifiable evidence |
What changes on 1 October 2027
The standalone allowance ends (Article 3 of 2026/1963), and Dutch Customs says C131 becomes the required document, with C132 to C139 kept only as supporting documents. The same day, Article 5(1)(j) of 2026/1384 applies: melt and pour data gathered at import count when the Commission shares out country quotas. By 30 June 2028 it must assess whether melt and pour should decide quota access (Article 12(5)), and it can change the evidence list at any time (recital 13 of 2026/1963). The deadline is in Loharo’s events calendar.
What this means for buyers
Analysis Quotas are first come, first served: four weeks into the fourth quarter, 65 of 283 quota lines were used up, and our run-rate chart shows how fast the main ones go. A cargo held for documentary checks may miss the quota and pay the 50% out-of-quota duty set by the steel regulation; Irish Revenue tells declarants to lodge security for the full non-quota duty when a quota is critical (eCustoms notification 17/2026). In contracts, make a certificate stating the country and heat number for every heat a delivery condition, sent before arrival, and say who pays if goods are rejected or miss the quota. Check quota status in the Steel Trade Measures Tracker and CBAM costs in the free CBAM calculator.
Loharo checklist: what to ask your supplier
- The country of melt and pour on the certificate for every heat, as a country name, not just the mill’s address.
- The same heat numbers on the certificate, invoice and packing list.
- For product rolled from bought-in slab or billet, the country where that semi-finished steel was melted and cast; if several countries, each one per heat.
- A long-term supplier declaration as backup: it can complete a certificate, but stands alone only until 30 September 2027.
- Certificates sent with the shipping documents before arrival, and confirmation that they will meet the rule for shipments arriving from 1 October 2027.
Third-party tool
Third-party tool: run by FreightParse, not by Loharo. Loharo is not paid for this mention and does not endorse the results. FreightParse, a Rotterdam company, offers a free melt and pour check: upload one mill certificate (PDF or photo) and it shows, per heat, the country of melt and pour as printed, its page and a proposed Y-code and C-code, and flags a missing country with a draft request for the supplier. FreightParse says three checks a day are free with no sign-up, and Pro costs EUR 39 a month excluding VAT for 200 checks. The codes are a proposal: the declarant decides.
Verification status: Verified
- The rule, its dates, the evidence list and the definition were checked against the Official Journal texts of Regulations 2026/1963 and 2026/1384; the codes against Dutch Customs’ notice. The FreightParse details are the company’s own, checked on its live page and attributed; the decision table, checklist and buyer reading are Loharo analysis built from those sources.
- Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.
Sources
Primary sources
- Commission Implementing Regulation (EU) 2026/1963 on determining the type of evidence to be provided by importers to prove the country of ‘melt and pour’ — Official Journal of the EU, 28 August 2026 (OJ L, 31 August 2026)
- Regulation (EU) 2026/1384 addressing the negative trade-related effects of global overcapacity on the Union steel market — Official Journal of the EU, 17 June 2026 (OJ L, 24 June 2026)
- Invoeraangifte staalproducten: zo geeft u het land van smelten en gieten aan — Douane Nederland (Dutch Customs), 30 September 2026, updated 1 October 2026 (Dutch)
- eCustoms Helpdesk Notification 17/2026: Steel quotas and evidence of the country of melt and pour — Irish Revenue, 4 September 2026
Supporting sources
- Melt and pour: check one mill certificate — FreightParse (company page, read 13 November 2026)
- Steel Trade Measures Tracker — Loharo
Last fact-check: 13 November 2026.
Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.