• EU HRC (N. Europe)€750–795/tex-works N. Europe; German mill offers €775–795/t; seller deals €750–760/t for December and offers €770–785/t ex-works; trade source said prices below €785/t no longer seen at mills; Fastmarkets index €775.63/t on 18 Nov18 Nov 2026 · Fastmarkets via EUROMETAL
  • China steel exports9.854 MtOctober; Jan–Oct 95.495 Mt, −2.3% y/y10 Nov 2026 · China Customs via Mysteel / SMM
  • World crude steel142.4 MtSeptember, −0.2% y/y23 Oct 2026 · worldsteel
  • Iron ore fines 61%$89.10/dmtseaborne 61% fines, SMM; unchanged d/d20 Nov 2026 · SMM via Hellenic Shipping News
  • Turkish HMS 1&2 (80:20)$397/tCFR, October average11 Nov 2026 · GMK Center
  • EU CBAM certificate€82.32Q3 2026 price, per certificate5 Oct 2026 · European Commission
  • US Section 232 steel10%–50%tariff, by product/country8 Oct 2026 · Congressional Research Service

Pittini will stop its Verona and Potenza mills for a week from 30 November: about 40,000 t of Italian long steel off the market, and a likely repeat in December

Pittini plans to halt melting and rolling at Acciaierie di Verona and Siderpotenza from 30 November to 4 December over energy costs, a company source said, with another week likely in December. Loharo works out the tonnes lost and what Italian wire rod could cost.

By Mara AlvestadPublished 4 min read
Illustration: a tied rebar mesh and column cages on a construction deck under an overcast sky
Illustration of rebar reinforcement on a construction site

Pittini, one of Italy’s leading long-steel producers, plans to stop melting and rolling at its Acciaierie di Verona and Siderpotenza plants for a full week from 30 November to 4 December because of power and gas costs, a company source told Metal Expert (Metal Expert via EUROMETAL, 17 November). The source said a second week-long stop in December is likely. SteelOrbis reported the same dates, citing local media (SteelOrbis). Pittini has not published a statement.

What is stopping

PlantMelting (EAF), t/yearRolling mill, t/yearProducts
Acciaierie di Verona1.1 million950,000Wire rod and rebar
Siderpotenza (Potenza)1.0 million700,000Rebar
Total2.1 million1.65 million
Capacities as reported by Metal Expert.

Italian long-steel producers stopped selling and withdrew offers from the middle of last week, initially following Pittini’s lead, one producer told Metal Expert, and expects prices to rise by at least another €20–30 a tonne when quoting resumes. Before sales stopped, workable prices for drawing-quality wire rod were €690–700 a tonne delivered (DAP), and Italian rebar €480–490 a tonne ex-works base (about €740–750 for 12 mm B450C). One producer plans €740 DAP for 5.5 mm drawing-quality wire rod.

Loharo calculation: tonnes lost and what a price rise costs

ScenarioMelting capacity idledRolling capacity idled
One week (30 Nov–4 Dec)about 40,000 tabout 32,000 t
Two weeks (if December stop follows)about 81,000 tabout 63,000 t
Loharo calculation: annual nameplate capacity ÷ 52 weeks × weeks stopped. Nameplate, not actual output, so these are upper bounds.
Drawing-quality wire rod, 1,000 tPrice per tonne (DAP)Cost of 1,000 tExtra versus €695
Before the sales stop (mid-point)€695€695,000—
+€20 (producer’s low expectation)€715€715,000+€20,000
+€30 (producer’s high expectation)€725€725,000+€30,000
One producer’s €740 target€740€740,000+€45,000
Loharo calculation from the Metal Expert price levels; mid-point of the €690–700 workable range.

What this means for buyers

Analysis If you buy Italian rebar or wire rod for December delivery, confirm now whether your order is rolled at Verona or Potenza and whether it is affected by the 30 November–4 December stop. With Italian offers withdrawn, budget for €20–45 a tonne more on wire rod; compare that with import offers and the quota room left, as set out in our ArcelorMittal report. A second December stop would roughly double the lost tonnage.

What to watch

Verification status: Developing

  • The stop dates, the likely December repeat, the plant capacities and the Italian price levels come from Metal Expert via EUROMETAL (a company source and Italian producers); the dates are also reported by SteelOrbis citing local media. Pittini has not published a statement, so the plan is attributed and could change; Loharo will re-check after 4 December. The lost-tonnage and price tables are Loharo calculations.
  • Key: Verified = material factual claims are supported by an appropriate primary source or clearly attributed reporting/market assessments; Partially verified = a specific material claim remains unsupported, contradicted or materially overstated; Analysis = interpretation or forecast with sourced premises; Developing = material facts are checked but the situation is still changing.

Sources

Primary sources

Supporting sources

Last fact-check: 18 November 2026.

Planning steel imports into the EU? Estimate CBAM costs with the free calculator using EU default values. For supplier-specific emissions and a portfolio review, see the CBAM Cost Check.

Ask the Analyst

“What could CBAM add to Indian HRC delivered to Rotterdam in 2027?”: landed cost with duty, quota and CBAM in one answer.Ask the Analyst

Facts, analysis and uncertainty are labelled in line with our editorial standards. Report an error – corrections are dated and noted on the article. Information and analysis only, not investment advice.